Warning: count(): Parameter must be an array or an object that implements Countable in /homepages/3/d340775477/htdocs/clickandbuilds/AlgerieSalons/wp-includes/post-template.php on line 284

Warning: count(): Parameter must be an array or an object that implements Countable in /homepages/3/d340775477/htdocs/clickandbuilds/AlgerieSalons/wp-includes/post-template.php on line 284

Warning: Use of undefined constant full - assumed 'full' (this will throw an Error in a future version of PHP) in /homepages/3/d340775477/htdocs/clickandbuilds/AlgerieSalons/wp-content/plugins/rss-post-importer/app/classes/front/class-rss-pi-front.php on line 199

Warning: Use of undefined constant full - assumed 'full' (this will throw an Error in a future version of PHP) in /homepages/3/d340775477/htdocs/clickandbuilds/AlgerieSalons/wp-content/plugins/rss-post-importer/app/classes/front/class-rss-pi-front.php on line 252

Raffinerie pétrolière d'Alger: les travaux de réhabilitation confiés à une société chinoise

Raffinerie pétrolière d'Alger: les travaux de réhabilitation confiés à une société chinoise
ALGER – Les travaux de réhabilitation de la raffinerie pétrolière de Sidi R’zine (Alger), à l’arrêt depuis 2015 suite à la résiliation du contrat avec la société française Technip, seront attribués à une société chinoise, a indiqué lundi à Alger le P-dg de Sonatrach, Amine Mazouzi. “Après une large consultation,…

Source: New feed1

Raffinerie pétrolière d'Alger: les travaux de réhabilitation confiés à une société chinoise